Key takeaways
- A punch list is the final list of small fixes
- Walk the space with your builder and tag every item
- Your closeout package holds permits, manuals and keys
- A final clean leaves the space ready for opening day
A punch list is the last list of small items to fix: scuffs, adjustments, missing hardware.
The walk-through
Walk the space together, tag each item with tape and photograph it. Fixes are scheduled and checked off.
The closeout package
You should receive permits, inspection records, manuals, keys and a record of what was built.
The final clean
A detail clean just before you move in finishes the job.