The Bestiary
The Build-Out Bestiary
A field guide to the creatures of commercial construction: plain-English meanings for lease, permit, drywall and systems words, so plans and quotes make sense.

- Build-out
- Construction that fits a commercial space to a tenant, from walls and floors to power, air and finishes.
- Tenant improvement
- Another name for a build-out, often shortened to TI. It can also mean the allowance a landlord gives toward the work.
- TI allowance
- Money a landlord contributes to a tenant's build-out, usually per square foot and often paid after the work is done.
- Vanilla shell
- A basic space with a finished exterior, a roof, a floor and basic utilities stubbed in, but little else inside.
- Gray shell
- A shell with even less done inside than a vanilla shell, often with exposed concrete, no ceiling and no walls.
- Second-generation space
- A space that has been built out before. Some of the work is demolition and reuse.
- Turnkey
- A project where the builder delivers a finished space, ready for the tenant to move in.
- Work letter
- An exhibit to the lease that says what the landlord builds, what the tenant builds and who pays for it.
- Test fit
- A quick floor plan that shows whether a tenant's needs fit in a space, made before a lease is signed.
- Demising wall
- A wall that separates one tenant's space from the next. It is usually fire-rated and sound-rated.
- Fire-rated assembly
- A wall, floor or ceiling built to resist fire for a set time, such as one hour.
- Egress
- The path people use to leave a building, with enough exits, widths and signs for the number of people inside.
- Occupancy
- How a building is used and how many people it may hold. A change of use may need new permits.
- Certificate of occupancy
- The document the city issues when a space passes its final inspections and may open for business.
- AHJ
- Authority having jurisdiction: the city, county or fire department that reviews, permits and inspects the work.
- Plan review
- The city's check of drawings against the code before a permit is issued.
- ADA
- The Americans with Disabilities Act. Its standards set clearances, heights and routes so spaces are usable by everyone.
- MEP
- Mechanical, electrical and plumbing: the systems that heat, cool, power and supply water to a space.
- Plenum
- The space above a ceiling or below a floor that carries air, and often wiring, so special materials may be required.
- RTU
- Rooftop unit: a self-contained heating and cooling machine on the roof, common on retail and industrial buildings.
- Make-up air
- Fresh air supplied to replace what a kitchen hood or exhaust fan removes.
- Grease interceptor
- A trap that catches fats, oils and grease before wastewater leaves a kitchen.
- Submittal
- Product data and samples the builder sends for approval before ordering, such as doors, glass or fixtures.
- RFI
- Request for information: a written question that clears up a drawing or a field condition.
- Change order
- A written agreement to change the scope, price or schedule after work has begun.
- Long-lead item
- A product that takes weeks to arrive, such as storefront glass, doors, kitchen equipment or switchgear.
- Punch list
- The final list of small items to fix or finish before a project is complete.
- As-builts
- Drawings that show what was actually built, including changes made in the field.
- Millwork
- Custom woodwork such as reception desks, counters, shelves and wall panels.
- Soffit
- A lowered section of ceiling, often used to hide ducts or pipes.
- Mezzanine
- An intermediate floor between two main floors, often added in warehouses for offices or storage.
- Foot-candle
- A measure of light falling on a surface. Different rooms need different levels.
- Closeout
- The last phase of a project: final inspections, punch list, documents, keys and walk-through.